BecSpec Because specs matter.
Data & provenance

What sits behind the nozzle finder.

The public payload is intentionally smaller than the research archive. Rights and evidence state decide what ships.

JKI DAPS

Current factual recognised-nozzle data is used under written JKI permission received 12 August 2026, with JKI/DAPS attribution. This release uses exact min/max pressure droplet endpoints from the 11 August snapshot.

Hydraulics

Public flow values are calculated from standard ISO nominal size using Qp = Q3bar × √(P/3). Manufacturer tables were used during private validation but are not bulk-published.

Australian availability

The first release is limited to four families confirmed current in Australia in the frozen 12 August 2026 availability pass. That is a market-currentness check, not regulatory approval.

APVMA boundary

The user supplies the water-rate and droplet instruction from the current approved label. JKI and other overseas technical sources never replace APVMA regulatory directions.

Rights boundary

Manufacturer source tables, manuals and manual-derived validation material remain outside the public dataset unless separately cleared. JKI has a future-licensing review trigger; if its terms change, BecSpec must re-review this layer.